GET A QUOTE:
UK/ROTW +44 [0]1706 855558 | Americas 888 685 9478 | Asia-Pacific +61 3 8840 6556

Case study gallery

You are here: Home > Case studies > Case study gallery

Browse our growing gallery of Cablenet installations.

Like what you see? Don't miss our detailed case studies showcasing more than 25 of our most prestigious tension wire grid installations.

Alleyns School

Alleyns School

Dulwich, UK

Contracted by Rooff Ltd this installation in the Edward Alleyn Building at Alleyns School is a single frame, approximately 9.75m x 7.9m with a walkway around the perimeter, and is suspended from steelwork.

Longwire · Newbuild

Bernie Grant Centre

Bernie Grant Centre

Tottenham, UK

Installed in the theatre at the Bernie Grant Centre for the Performing Arts, this 19.3m x 14.7m tension wire grid is installed to the specification produced by Carr and Angier, Theatre Consultant and agreed with the Main Contractor, Adjaye Associates, Architects and Yolles Partnership, Structural Engineers.

Bitterne Park School

Bitterne Park School

Southampton, UK

Contracted by Neilcott Construction Ltd for supply and installation, this is a single frame tension wire grid with two walkways: one 2.9m x 2.3m and one 7.6m x 2.3m which includes a ramp. The Cablenet is suspended from the steelwork structure which sits directly above.

Longwire · Newbuild

Black Box Theatre, Macau

Black Box Theatre

Macau

Slingco supplied and delivered assembled modular panels for this tension wire grid to Macau Port from where the main contractor, San Kei Ip, arranged delivery to site and completed the installation. Theatre consultants OBS Architects commented "The modular Cablenet works perfectly and the stage manager is very happy with it".

Modular

Cornerstone Arts Centre

Cornerstone Arts Centre

Halifax, UK

Contracted by Wildgoose Construction Ltd, this installation comprises two frames: a top frame approximately 9.3m x 2m, and a lower frame approximately 9.50m x 8.1m which includes a walkway on three sides. The installation is suspended from hanger boxes supplied by Slingco.

Longwire · Newbuild

Devenport High School

Devenport High School

Plymouth, UK

Contracted by TEC Construction, this tension wire grid is installed in the Theatre at Devonport High School for Boys. The Cablenet is a single frame, approximately 12 x 11.8m with self-closing, gated access from the balcony and music gallery. The entire grid is suspended by hangers from the existing roof steelwork and two new additional steel members.

Longwire · Newbuild

Garth Hill College

Garth Hill College

Bracknell, UK

Contracted by the Bracknell Forest Borough Council, this tension wire grid installation is a single frame, approximately 16 x 15.5m, suspended from existing roof steelwork.

Longwire

Hillsborough College

Hillsborough College

Sheffield, UK

Contracted by Audio Light Systems, and coordinated by Clugston Construction Ltd and Theatre consultants Drama by Design Ltd, this single frame installation - approximately 17.75m x 14.80m in size - is suspended from steelwork structure situated directly above.

Longwire · Newbuild

Leeds Beckett University

Leeds Beckett University

Leeds, UK

Contracted by Centre Stage Eng Ltd, and coordinated by the Theatre Consultant Charcoalblue, this tension wire grid and walkway comprises two frames, covering a total area of 14.8m x 14.2m. The installation is suspended from steelwork structure situated directly above.

Longwire · Newbuild

Lincoln Performing Arts Centre

Lincoln Performing Arts Centre

Lincoln, UK

Installed at a height of 4.4 m in the School of Performing Arts, Lincoln University, this tension wire grid is installed to specification agreed with the Main Contractor, University of Lincoln Planning and Development Division and Ward Cole Consulting Engineers.

Longwire · Newbuild

St. Pauls Drama School

St. Pauls Drama School

Hammersmith, London, UK

Contracted by Elliott Thomas Construction Ltd and coordinated by Nicholas Hare Architects / Charcoalblue Theatre Consultants this tension wire grid installation comprises three frames, one approximately 10.75m x 3m and two 5m x 4.25m. The installation is suspended from steelwork situated directly above.

Longwire · Newbuild

Sutton Valance School

Sutton Valance School

Maidstone, UK

A single frame tension wire grid, approximately 13.5m x 7.9m with a walkway and access staircase at the control room end, contracted by Quadric. Installed in the school theatre, the Cablenet is suspended from the existing roof steelwork by hangers and wall mounted brackets.

Longwire

Baths Hall Sunderland

The Baths Hall

Scunthorpe, UK

Contracted by Clugston Construction Ltd this Cablenet comprises two frames, approximately 15m square with a walkway around the perimeter, and is suspended from steelwork.

Longwire · Newbuild

Winchester College

Winchester College

Scunthorpe, UK

Contracted by Winchester College for design, manufacture and installation, this single frame Cablenet is fitted underneath the existing timber roof trusses. It includes a self-closing gate and handrail around the entire outer frame, and is supported by clamping brackets over the bottom truss member.

Longwire · Retrofit

Arrange a visit
Cablenet Tension Wire Grid installation RADA, London, UK

See Cablenet for yourself! We'd be happy to arrange for you to visit one of our existing tension wire grid installations, accompanied by one of our specialists.

Arrange a visit
Online estimator
Cablenet Tension Wire Grid installation Helsingborg, Sweden

We appreciate that all venues are unique and that design requirements can also be very different, but to help estimate budget for a Cablenet tension wire grid, we've created a simple cost estimator.

Open cost estimator
PROJECT TIMELINE
Cablenet Tension Wire Grid installation 3D render example

Our design, development and installation processes are structured to ensure that every stage of your experience of working with Slingco is handed in an efficient and professional manner

Find out more

How can we help?

To find out more, please call, email or send our enquiry form. We look forward to speaking with you.

Why choose Slingco for your tension wire grid?

CUSTOM DESIGN MEANS MORE FLEXIBILITY

New build or listed building, any shape or size, tailored load capacity ... schools and colleges, theatres, exhibition halls and arenas..

COMPLETE TURNKEY SERVICE

Design, manufacture, installation, inspection and certification, including liaison with third-party architects and design teams.

SOLUTIONS TO SUIT YOUR PROJECT AND BUDGET

We’ll ensure you get the cost vs. customisation balance right.

25 YEARS EXPERIENCE, INSTALLATIONS ON FOUR CONTINENTS

Unrivalled experience and support with 12-year warranty as standard.