GET A QUOTE:
UK/ROTW +44 [0]1706 855558 | Americas 888 685 9478 | Asia-Pacific +61 3 8840 6556

Liverpool Institute for Performing Arts TENSION WIRE GRID INSTALLATION IN NEW-BUILD PERFORMING ARTS CENTRE

You are here: Home > Case studies > Liverpool Institute for Performing Arts

Cablenet installed at LIPA's 6th Form College, enabling teaching staff and 16-18-year-old pupils to access the overstage area.

The tension wire grid, measuring approximately 14.4m x 10.2m, is housed in a new-build steel framed studio theatre and involved the installation of just short of 4.5km of wire rope.

An integral requirement of the design was that the grid could allow equipment to be transferred from below to a position above it. A section was therefore created in the grid that could be easily removed, with all associated safety requirements being addressed.

TENSION WIRE GRID TYPE

LongWire

INSTALLATION

  • New build
  • 14.4m x 10.2m tension wire grid

Architect

Ryder Architecture

Main contractor

Kier Northern

Theatre consultant

Kier Northern
LIPA sixth form have had our tension wire grid since 2016 and this has allowed our students to have an unrivalled learning experience allowing hands on work at height with minimum risk. Without the TWG our theatre would not be able to be ran solely by students, the TWG gives them the ability to build their designs in the theatre space. The Slingco team have always been great and nothing but helpful.
Arrange a visit
Cablenet Tension Wire Grid installation RADA, London, UK

See Cablenet for yourself! We'd be happy to arrange for you to visit one of our existing tension wire grid installations, accompanied by one of our specialists.

Arrange a visit
Online estimator
Cablenet Tension Wire Grid installation Helsingborg, Sweden

We appreciate that all venues are unique and that design requirements can also be very different, but to help estimate budget for a Cablenet tension wire grid, we've created a simple cost estimator.

Open cost estimator
PROJECT TIMELINE
Cablenet Tension Wire Grid installation 3D render example

Our design, development and installation processes are structured to ensure that every stage of your experience of working with Slingco is handed in an efficient and professional manner

Find out more

How can we help?

To find out more, please call, email or send our enquiry form. We look forward to speaking with you.

Why choose Slingco for your tension wire grid?

CUSTOM DESIGN MEANS MORE FLEXIBILITY

New build or listed building, any shape or size, tailored load capacity ... schools and colleges, theatres, exhibition halls and arenas..

COMPLETE TURNKEY SERVICE

Design, manufacture, installation, inspection and certification, including liaison with third-party architects and design teams.

SOLUTIONS TO SUIT YOUR PROJECT AND BUDGET

We’ll ensure you get the cost vs. customisation balance right.

25 YEARS EXPERIENCE, INSTALLATIONS ON FOUR CONTINENTS

Unrivalled experience and support with 12-year warranty as standard.